Mini Continuous Flight Auger Pile - Mini CFA



Rei Helice Continua has always worked with drills in small and medium sized construction works and analyzing the foundations market, it was realized a huge shortcoming, as the various types of existing solutions were based only on large machines.

With the difficulties and needs encountered in these works, Rei has created a small-sized and innovative equipment designed to be agile in its transport and assembly, as well as being more efficient and allowing high productivity in the foundations of works performed in small spaces.

Exceeding market expectations with an innovative monitored mini continuous flight auger pile (mini CFA), Rei Helice Continua has developed unique differentials to serve its customers and perform the foundation works.


Helice Continua - Diferenciais Exclusivos para Obras de Fundação

EXCLUSIVE DIFFERENTIALS OF REI HELICE CONTINUA



LOW MOBILIZATION COST

As it is a compact equipment, it is not necessary to use large platforms for transportation. For this reason, smaller trucks are used, which facilitates movement in large urban areas. In addition, it is extremely quick to assemble it at the construction site, lowering the mobilization cost.


Fundação com Estacas de Baixo Custo de Mobilização

WORKS EXECUTION IN DIFFICULT ACCESS AREAS

Due to the high value per square meter of the grounds located in cities, there is a tendency for constructions to be carried out on small spaces.

One of the differentials of Rei is precisely its ability to perform the foundation works in complex and small areas, at least 5 meters wide.


Estaca helice continua

RESTRICTED AREAS

In large urban centers there are restrictions and the need for authorization to move large platforms, and often the machine mobilization occurs at night, resulting in higher costs for the customer.

All transportation of the equipment is carried with small-sized truck. In this case, permission is not required, bringing savings to the customer.

Fundações em centros urbanos
 

PILES EXECUTION IN PREEXISTENT CONSTRUCTIONS

Rei has developed a head made exclusively to provide high torque during foundations execution, primarily allowing close drilling of existing walls and constructions, avoiding lever beams in foundation designs, at a lower cost than concrete and hardware used in the lever beams.


Estaca perfurando rente a paredes e muros

RETAINING WALL

Rei has already carried out several retaining walls works, that is, piles with minimal spacing between existing buildings, providing more space in garages and basements, as well as allowing a better use of the ground.


Cortina de contenção de fundação
 

HIGH PRODUCTION

Rei aims to always offers high quality in its foundation services, as well as to achieve a high production, whose current daily volume is around 300 to 600 meters, depending on the diameter and resistance of the soil.

In addition to provide a high production, Rei's efficiency allows the early completion of the works, enabling gains to its customers, as it reduces costs related to the use of concrete pumps.

Alta Produção Fundações
 

ABSENCE OF VIBRATIONS / NOISES

The drilling is performed without vibration and noise, being an important factor when the works are performed in urban areas, avoiding disturbances with the neighborhood during the execution of the work foundations.

Estaca ausente de vibrações e ruidos
 


SHARE

       
LANGUAGES   Português    Español    English
Headquarters: Barão de Mauá Street, 236   -   City: Goiânia / GO   -   Brazil
Rei Helice Continua © 2020. All rights reserved   |   TERMS AND CONDITIONS   |   PRIVACY POLICY   |   Developed by Lobe Tecnologia

We use cookies and similar technologies in accordance with our Privacy Policy and by continuing to browse this website you agree to these conditions.

X